PASO ROBLES — Merry Hill tank will be drained of water starting Monday, Feb. 4 and continuing until Friday, Feb. 8.
This is in preparation for the city’s contractor to rehabilitate the interior of the tank to address surfaces that have deteriorated. Rehabilitation work includes re-coating ladder interior, spot repair of interior coating, installing new foundation and anchors and welding some areas as needed.
Merry Hill Tank is located on the west side of the city. The tank is a 0.15 million gallon circular welded steel tank with a 30-foot diameter and a shell height of 32 feet. The tank was constructed in 1962.
Share on Facebook